An ant colony optimisation algorithm for balancing two-sided U-type assembly lines with sequence-dependent set-up times

10Citations
Citations of this article
16Readers
Mendeley users who have this article in their library.
Get full text

Abstract

Some practical arrangements in assembly lines necessitate set-up times between consecutive tasks. To create more realistic models of operations, set-up times must be considered. In this study, a sequence-dependent set-up times approach for two-sided u-type assembly line (TUAL) structures is proposed for the first time. Previous studies on TUAL have not included set-up times in their analyses. Furthermore, an algorithm based on the Ant Colony Optimization (ACO) algorithm, which is using a heuristic priority rule based procedure has been proposed in order to solve this new approach. In this paper, we look at the sequence-dependent set-up times between consecutive tasks and consecutive cycles, called the “forward set-up time” and the “backward set-up time”, respectively. Additionally, we examine the “crossover set-up time”, which arises from a new sequence of tasks in a crossover station. In order to model more realistic assembly line configurations, it is necessary to include sequence-dependent set-up times when computing all of the operational times such as task starting times and finishing times as well as the total workstation time. In this study, the proposed approach aims to minimize the number of mated-stations as the primary objective and to minimize the number of total workstations as a secondary objective. In order to evaluate the efficiency of the proposed algorithm, a computational study is performed. As can be seen from the experimental results the proposed approach finds promising results for all literature-test problems.

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Cite

CITATION STYLE

APA

Delice, Y., Aydoğan, E. K., Söylemez, I., & Özcan, U. (2018). An ant colony optimisation algorithm for balancing two-sided U-type assembly lines with sequence-dependent set-up times. Sadhana - Academy Proceedings in Engineering Sciences, 43(12). https://doi.org/10.1007/s12046-018-0969-9

Readers' Seniority

Tooltip

PhD / Post grad / Masters / Doc 2

67%

Lecturer / Post doc 1

33%

Readers' Discipline

Tooltip

Engineering 4

80%

Computer Science 1

20%

Save time finding and organizing research with Mendeley

Sign up for free