Simultaneous Scheduling of Machines and AGVs in FMS Through Ant Colony Optimization Algorithm

  • et al.
N/ACitations
Citations of this article
3Readers
Mendeley users who have this article in their library.
Get full text

Abstract

High amount of flexibility and quick response times have become essential features of modern manufacturing systems where customers are demanding a variety of products with reduced product life cycles. Flexible manufacturing system (FMS) is the right choice to achieve these challenging tasks. The performance of FMS is dependent on the selection of scheduling policy of the manufacturing system. In Traditional scheduling problems machines are as considered alone. But material handling equipment’s are also valuable resources in FMS. The scheduling of AGVs is needed to be optimized and harmonized with machine operations. Scheduling in FMS is a well-known NP-hard problem due to considerations of material handling and machine scheduling. Many researchers addressed machine and AGVs individually. In this work an attempt is made to schedule both the machines and AGVs simultaneously. For solving these problems-a new metaheuristic Ant Colony Optimization (ACO) algorithm is proposed.

Cite

CITATION STYLE

APA

Sai, R. S. K. (2020). Simultaneous Scheduling of Machines and AGVs in FMS Through Ant Colony Optimization Algorithm. International Journal of Engineering and Advanced Technology, 9(3), 1392–1397. https://doi.org/10.35940/ijeat.c5410.029320

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free