Construction is one of the most important employment sectors in India with very minimal research being done to identify the delay factors and causes that affect the construction Industry. The opinions of the construction professional required for the research was obtained by conduction interviews. A set of questions were circulated between the professionals working on the site to acquire the causes and effects of delays faced by them. To resolve the issues various studies and researches have been done by various researchers. The data analyzed in the research was done by using Relative Important Index (RII) which helpsto categories and rank the causes of delays according to the importance of the causes with respect to its contribution towards time delays, arbitration, litigation, cost overrun and total abandonment. Spearmen’s rank correlation coefficient was used compare the effect of delays between contractors, owners and consultants. In this paper, the research is aimed towards finding the effects of various causes on the various parties on construction sites of coastal parts of Mumbai and methods of minimization of the same.
CITATION STYLE
Hunashyal, Dr. Anand. M. (2020). Analysing Delays of Construction Projects in Western Part of Mumbai: Causes and Effects. International Journal of Innovative Technology and Exploring Engineering, 9(5), 823–836. https://doi.org/10.35940/ijitee.e2609.039520
Mendeley helps you to discover research relevant for your work.